Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

  • Type: Journal Article
  • Keywords: Management; Construction; Questionnaire survey; Construction safety;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-01-2018-0003
  • Abstract:
    Safety climate (SC) is considered a leading indicator of safety performance, but scholars suggest that a common SC assessment framework is yet to be developed. Following the debate between the importance of facet analysis and agent analysis, the purpose of this paper is to test a factor structure, developed by the authors in previous work and arising from their systematic literature review, highlighting the role of safety agents in a construction site setting. Design/methodology/approach Multi-level SC surveys were conducted at five construction sites in Sydney, Australia, collecting data from of 352 workers associated with a mega-construction project. While examining the factor analysis of different studies, data reliability and data validity of the survey findings were ensured and a goodness-of-fit of SC model was examined through structural equation modelling. Findings The systematic literature review of Newaz et al. (2018) suggested a five-factor model of: management commitment, safety system, role of the supervisor, workers’ involvement and group SC. However, empirical data indicated that the questionnaire used to measure “safety system” failed to pass scale reliability; thus, a four-factor model was proposed to develop an agent-specific SC factor structure in the construction industry. Originality/value The four-factor model indicates the role and level of influence of different safety agents to improve safety perceptions on construction sites. The findings of this study will encourage researchers in construction safety to use the simplified four-factor SC (agent-specific) model presented and test it to further develop a common factor structure for the construction industry. The fact that the model is comprised of four factors makes further implementation somewhat easier in the development of safety plans, and when considering the role of safety agents, therefore enhancing its potential value.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.